Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9752413

- Product Categories
- Friendly Links
Information Name: | The region's most popular buildings in Shanxi, Shanxi Shimizu template template |
Published: | 2013-08-16 |
Validity: | 800 |
Specifications: | 915 * 18301220 * 2440 |
Quantity: | 999999.00 |
Price Description: | |
Detailed Product Description: | The company specializes in producing plywood and plywood, using melamine glue, poplar whole entire core sandwich panels, through advanced production process from processing. With reliable quality, high tensile strength, water resistance, smooth and so on. Management: Quality is the life, but also my long-term development of protection. Product quality is not only affected my company's reputation and image, and it is closely related to the vital interests of our customers and constantly break through the self, showing technology, quality, service, rigor and respect. Contact: Manager Wang Mobile: 15620997912, large format: maximum width is 2440 × 1220,915 × 1830mm. Reduce the number of joints, improve the work efficiency of formwork is not warp, no distortion, no cracking, good water resistance, high turnover times. stripping easy, only steel 1/7 light weight: more suitable for high-rise building and bridge construction. use more often: Proper storage, use case construction template can be used repeatedly. concreting : pouring surface is smooth and beautiful, minus the wall two plastering crafts, decorative veneer directly duration 30% reduction. Corrosion: building templates do not pollute the concrete surface. insulation performance: the use of winter construction, do bending plane template construction performance: nails, sawing, drilling, etc. is better than bamboo glue template, a small plate, plywood construction needs can be processed into various shapes of the template. Langfang Kim Hyung Wood Co., Ltd. is a China Construction Group, Zhongtian Construction Group, Long Yuan Construction Group, Zhejiang Zhongcheng Construction Engineering Group, Zhejiang Baoye Construction Group, Shanghai Construction Co., Ltd., the country of Haiti a construction unit of several well-known high-quality customers. Langfang Kim Hyung Wood Project model: Hefei Gold Zone, Tianjin Laguna Cheung Chau, TEDA Street, Wulanchabu gymnasium, beauty hung Zhengzhou City, Chengdu Vanke Golden Hairong project, Changchun Light Rail Station, Hohhot Museum, Xi'an High-tech International Business Center, Jinzhou International Hotel, Nanjing Hilton Hotel and so on. Kim Hyung template built a century engineering your trusted partner for the new Guangzhou TV Tower, Shanghai World Financial Center Shanghai Tower, Changchun Light Rail station, etc., in construction formwork structural deformations are some common problems and how to solve the structural deformation architectural templates the problem is not a problem. We can solve these problems in several ways. (1) building templates and support system design should take full account of its own weight, construction loads and concrete pouring contentment and lateral pressure generated when, in order to ensure building templates and frame have enough carrying capacity, stiffness and stability . (2) the end of beam support spacing should be able to ensure that the weight of concrete and construction loads without deformation, supporting the bottom of the case of soil foundation, should be carefully compacted, set up drainage ditches and laying a long pass skids or steel, to ensure support is not subsidence. (3) pouring concrete, less than expected to be symmetrical, strict control of water level, especially plywood door and window openings on both sides is necessary to ensure compacting concrete vibrators, but also to prevent excessive vibration caused by construction template deformation. (4) beams, columns, construction template if using cards clams, its distance to the provisions set up, and be clamped building templates, and its width is slightly smaller than the cross-sectional dimension. (5) beams, wall formwork must have a temporary upper head support to ensure the concrete pouring, the beams, the wall opening width. (6) Combination small steel assembly, the connector should be required to be placed, and the right bolt purlin spacing specifications design requirements should be set. (7) for the span of not less than 4m in situ reinforced concrete beams, plates, and its construction template design requirements should be bagging; When the design is no specific requirement, bagging height appropriate for the span 1/1000-3/1000. (8) with wooden plywood, plywood, plywood construction, after their acceptance should be pouring concrete, timber formwork to prevent long-term exposure to rain deformed. |
Admin>>>
You are the 7149 visitor
Copyright © GuangDong ICP No. 10089450, Http Mian splashed reading Die intoxicated chain ?? Gu chain Factories Gao ? ?? ?? All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7149 visitor
Copyright © GuangDong ICP No. 10089450, Http Mian splashed reading Die intoxicated chain ?? Gu chain Factories Gao ? ?? ?? All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility